Thursday, February 13, 2014

More pictures as of February 13 2014


Oil pickup with check valve and level stick
 

belly shield with louvers and hinged inspection shield
 
 

Inside view with stiffeners
 

Side shield installed
 

Belly shield installed
 

Inspection flap open, can be removed for cooling
 

Propeller temporarily installed
 

 
Prop hub, Oil tank and left shield in place
 

Oil tank, drain and gascolator,
 
 
Front shields and belly pan in place
 
 
 
By the way, we already have over 12 inches of snow on the ground,
so far 40 inches, and now getting another 18 inches.

A very helpful drawing of the D-Taube by Rozendaal 1913
 
 
 
 

Wednesday, November 20, 2013

Thursday, October 17, 2013

Getting the engine ready for installation




Engine in original inverted configuration



Unpacking and checking
Turing upright and changing carburetion
Carburetion adapter in place
 
 




Sunday, March 31, 2013

Ok, people ask me where they can follow the progress of my building of a 1912 full scale flying replica. So I decided to start a blog and post photos on it periodically . Here is where we are today, March 29 2013, couple days before Easter Sunday.
Fuselage basically completed
 


Side-Load Landing Gear completed

Before side cover fabrication

Controls are in



The Castering Gear


Raw Fuselage on wheels

Fitting and fabricating side covers

Seat Belts are in



Side covers completed  and installed

Side Covers and Turtle Deck installed


Fuel Tank and controls , King  Post and Rudders in background