
Lining up
Time to make engine noise
Rough installation.
| Fuselage basically completed |
| Side-Load Landing Gear completed |
| Before side cover fabrication |
| Controls are in |
The Castering Gear |
| Raw Fuselage on wheels |
| Fitting and fabricating side covers |
| Seat Belts are in |
| Side covers completed and installed |
| Side Covers and Turtle Deck installed |
| Fuel Tank and controls , King Post and Rudders in background |